Appointed by main contractor Farrans, Maintech Power designed and installed High Voltage infrastructure to support the operation of the fully opening Gull Wing Bridge, in Lowestoft. The bridge will be the third crossing over Lake Lothing and has been commissioned by Suffolk County Council to provide improved connections between the north and south of the town.
substations
of Low Voltage (LV) cables
Liaising with the Distribution Network Operator, UK Power Networks, Maintech Power secured the electrical connection for the site to enable the project to be delivered within the timescale set within the bridge’s wider construction programme.
Maintech Power worked in close collaboration with Farrans, its supply chain and UK Power Networks to deliver this project on time and on budget, ensuring the infrastructure was in place.
Gull Wing bridge is a very important project for our company. We have been working with our trusted supply chain to deliver a successful scheme which will deliver a positive, lasting legacy in Lowestoft. High voltage infrastructure requires highly competent expertise and Maintech Power has partnered well with us to provide this service.
Discover how our team of experts can support you with a true turnkey, added value, High Voltage design, build and O&M solution for your next project.